What Security Measures Should Be Taken After The Boiler Is Turned Off

2017-04-24 13:11:49

1.Continue to ventilate five minutes. Exclude remaining combustible material from the combustion chamber and flue, and then close the throttle and stop blower and induced draft fan operating, which can prevent the cooling causing the vapor pressure to drop too fast.
2.Keep the primary and secondary bypass after the flameout, or open primary bypass and reheater for exhausting steam, turn off after 10 ten minutes to maintain the superheater and reheater from overheating.
3. When the boiler is turned off, please strictly control the speed of the boiler buck, take the natural pressure relief mode. It is strictly forbidden to exhaust steam for forced decompression, so as not to damage the equipment.
4. When the boiler has pressure and auxiliaries have power, the boiler unit is not allowed to monitor.
5.In order to prevent heating surface of the boiler from corrosion, doing well in maintenances when the boiler is turned off according to the requirements.

Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons/hr
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other