4-5 MW Power Plant which will use the wastes produced by Specialized Industrial Area of Tannery.
a) Sludge Cake : produced from wastewater generated from on-site tanneries and associated industries during preparation of the hides
b) Grit, screening: generated at the inlet works to the waste water plant, generally a mixture of leather trimmings, hair and wool, requiring drying and shredding
c) Textile : This is cotton based textiles generated by the companies and will require shredding
d) Shavings : Produced during final finishing of skins/hided at the tannery and comprising of trimmings and shavings of skin/hide material
e) Pet : Plastics, generally as packaging materials (bags, small bins) requiring dry shredding
f) Wool: Mechanically extracted from sheepskins requiring dry shredding
g) Fleshing: limed and non-limed flesh skin, containing approximately 40% fat
Power Plant Boiler
We want to know the quotation of 4-5 MW Power Plant boiler, first we need to determine the size of the boiler. An hour's power generation of 4-5MW requires an industrial boiler of 25-30t/h. The biomass fuel components provided by the above users are relatively complex, and it is necessary to analyze which furnace type has the highest efficiency and the lowest operating cost. Classic furnace types can be selected: chain grate and circulating fluidized bed boiler. Users can choose the most suitable one according to their actual situation.