4 Sets of 1500kw Gas Boiler Plant

2023-01-09 08:39:40
Pos. Name of equipment and technical characteristics Type, brand, document symbol, data sheet symbol Code of Supplier Unit Quantity Mass of 1 unit,
Product kg
1 2 3 4 5 6 7 8
               
1 Gas Boiler Plant consist of:       set 4  
1.1 Gas water heating boiler Q=1500 kW (P=0,6 MPa, t=100 ˚C ) with geyser UNIMAT UT-L   Вosch pcs 1 4200
1.2 Boiler control cabinet       pcs 1  
1.3 Pneumatic hydrophore tank Р=0,6 MPa, V=500 L, Т=800С REFLEX G-500 7521006   pcs 1  
               
               
2 Chemical Water Treatment complete with:       set 1  
2.1 Chemical water treatment with chemical deaeration Q=1,0 m3/hr       set 1  
2.2 Plastic water storage tank 1,5 m3 1500ВФК2     pcs 1 40
               
3 Feed Pump Station complete with:       set 1  
3.1 Centrifugal pumps (Т=350С)  Q=1,5 m3/hr, B-NMD 25/190C/A   Calpeda pcs 2 42,0
  Н=29 mCE, n=2900 rpm, N=0,51 kW            
               
4 Boiler Circuit complete with:       set 1  
4.1 Boiler-circulating pumps (Т = 95 0С) Q=66 m3/hr, СМ100/1020   DAB pcs 4 109,3
  Н=7 mCE, N=5,5 kW            
               
5 Heat Energy Meter complete with:            
5.1 Thermal energy flanged tachometer complete with: SUPERCAL 531 SONTEX 440 AQUATHERM     set 1  
5.1.1 Calculator       pcs 1  
5.1.2 Flow tachometer DN200, PN10       pcs 2 77,0
5.2 Thermal energy flanged tachometer complete with: SUPERCAL 531 SONTEX 440 AQUATHERM     set 2  
5.2.1 Calculator       pcs 1  
5.2.2 Flow tachometer DN65, PN10       pcs 2 8,7
5.3 Thermal energy flanged tachometer complete with: SUPERCAL 531 SONTEX 440 AQUATHERM     set 1  
5.3.1 Calculator       pcs 1  
5.3.2 Flow tachometer DN50, PN10       pcs 1 7,0
5.3.3 Flow tachometer DN32, PN10       pcs 1 4,7
               
6 Hydraulic circuit complete with:       set 1  
6.1 Hydraulic arrow DN200, PN10   548200 Caleffi pcs 1 255,0
6.2 Magnetic networked sludge trap DN200, PN10, Т=1000С  MOS 400/200     pcs 1 220,0
               
7 Pneumatic tank circuit complete with:       set 1  
7.1 Hydraulic hydrophore tank Р=0,6 MPa, V=1500 L, Т=800С REFLEX G-1500 7526605   pcs 2 297,0
               
8 Heat exchangers DHW            
8.1 S&T Heat exchanger DHW Q=121 kW Vitocell 100-V CVA 1000   Viessmann set 2 367,0
8.2 S&T Heat exchanger DHW Q=80 kW Vitocell 100-V CVA 750   Viessmann set 1 295,0
               
9 Network recirculation unit DHW            
9.1 Recirculation pump DHW (Т = 60 0С) Q=1,2 m3/hr            
  Н=6 mCE, N=0,1 kW (carcass – bronze) IPL 40/70-0.12/2   Wilo pcs 2 11,0
               
11 Heating circuit system DHW            
11.1 Centrifugal pump (Т=800С) Q=14m3/hr, Н=5 mCE, N=1,0 kW IL 65/160-1,1/4   Wilo pcs 2 56,0
               
12 Network circuit (AHU)            
12.1 Centrifugal pump (Т=800С) Q=78 m3/hr,  Н=15 mCE, N=7,5 kW IL 100/250-7,5/4   Wilo pcs 3 138,0
               
13 Network circuit (FCU)            
13.1 Centrifugal pump (Т=800С) Q=25 m3/hr Н=15 mCE,  N=3,0 kW IL 65/120-3/2   Wilo pcs 2 66,0
               
14 Network heating circuit            
14.1 Centrifugal pump (Т=800С) Q=5,5 m3/hr, Н=15 mCE, N=1,0 kW IPL 32/130-1.1/2   Wilo pcs 2 24,0
Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other