serial number | project | unit | value | Remark |
1 | Rated evaporation | t/h | 130 | |
2 | saturated vapor pressure | MPa | 5.83 | |
3 | superheated steam pressure | MPa | 5.3 | |
4 | superheater outlet temperature | ℃ | 485 | |
5 | Feed water temperature | ℃ | 150 | |
6 | cold air temperature | ℃ | 20 | |
7 | Hot air temperature | ℃ | 121/162 | |
8 | exhaust temperature | ℃ | 135 | |
9 | Boiler thermal efficiency | % | 89.3 | |
10 | Total resistance of the flue | Well | 2618 | |
11 | primary wind resistance | Well | 13234 | |
12 | secondary wind resistance | Well | 6315 | |
13 | Return material wind resistance | Well | ||
14 | fuel consumption | kg/h | 15411.5 | |
15 | Continuous discharge rate | % | ≤2 |
serial number |
project |
unit |
value |
Remark |
1 |
steam drum ①Inner diameter ②Wall thickness ③Straight section length ④Material |
mm mm mm |
φ1600 60 9000 20g |
|
2 |
water wall ①Type ②Heating area ③Number of tubes ④Pipe specifications ⑤ Material |
— ㎡ root mm — |
Membrane hanging 574 296 φ60×5 20G |
|
3 |
Water-cooled separator ①Type ②Heating area ③Number of tubes ④Pipe specifications ⑤ Material |
— ㎡ root mm — |
Membrane 127
φ51×5 20G |
|
4 |
roof tube ①Type ②Number of tubes ③Pipe specification ④Material |
— root mm — |
78 f42 20G |
|
5 |
high temperature superheater ①Type ②Heating area ③Number of tubes ④Pipe specifications ⑤ Material |
— ㎡ root mm — |
screen hanging 163 108 φ42×5 12Cr1MoV |
|
6 |
low temperature superheater ①Type ②Heating area ③Number of tubes ④Pipe specifications ⑤ Material |
— ㎡ root mm — |
Light pipes in sequence 420 78 φ42×4 15CrMo |
|
7 |
desuperheater ①Type ②Outer diameter ③Material ④Temperature adjustment range |
— mm — ℃ |
water jet 273 20G 42.90 |
|
8 |
Economizer ①Type ②Heating area ③Number of tubes ④High temperature section ⑤Low temperature section ⑥Pipe specifications ⑦Material |
— ㎡ Screen Screen Screen mm — |
142 67 75 φ32×4 20G/GB5310 |
Two sets of staggered membrane economizers |
9 |
Air preheater ①Type ②Heating area ③Number of tubes ④Pipe specifications ⑤ Material |
— ㎡ root mm — |
horizontal sequence 3566
φ40×1.5/φ42×3 Q235-A.F、10CrNiCuP |
The upper stage heats the primary air, and the lower stage heats the secondary air |
Specification of CFB hot water boiler
91 MW coal fired CFB boiler has the following features:
1. Membrane water wall can make the boiler furnace, separator, and return feeding system as a whole, the overall boiler structure is compact
2. The separator structure and parameter design make great progress, effectively improve boiler combustion efficiency and separation efficiency
3. The return feeding system is composed by two pieces of membrane water wall, the partial heat brought by fly ash is absorbed by the water tubes, reduce fly ash temperature, no coking will be caused by secondary combustion in the feeding system
4. The wear design adopts several measures, coal fuel has a good adaptability, and the swirl fluidized combustion technology makes the materials swirl fluidized combustion in the combustion chamber to improve coal fired CFB boiler combustion efficiency. Besides, the failure rate is reduced, and it can long-time operation.
Background
Established in 2002, Balinzuoqi Thermal Power Company Limited is responsible for supplying heat for 1.2 million square meter, of which 0.4 million square meter central heating. To meet the ever-increasing heating need, the company established a new thermal power plant, and installed two sets of 12 MW sub-high pressure steam turbine generator and several sets of circulating fluidized bed boiler.
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.