1. Oil and gas dual-purpose hot water boiler body: WNS5.6-1.0-YQ=5.6MW P=18.5KW, two
2. Supporting burners: two
3. Heating hot water circulation pump: L=230 cubic meters per hour H=45M P=55KW, three sets (2 for use and 1 for standby)
4. Deaeration water pump: 8m3 per hour H=60M P=7.5KW two sets (1 for use and 1 for standby)
5. Fully automatic water softener: one
6. Analytical deaerator TH0-700: one set
7. Combined water tank for softening and deoxygenation: 2800*1800*1800, V=8 cubic meters
8. Heating circulation pump constant pressure water replenishment device: one tank with two pumps, constant pressure tank @ 800, water replenishment pump L=4 cubic meters per hour, H=30M P=2.2KW (two water replenishment pumps, one for use and one for backup) )
9. Oil storage tank: V=100 cubic meters, one
10. Comprehensive water treatment instrument: DN300 500W 220V, one set
Fuel gas dual-purpose hot water boiler
11. Daily oil tank: V= 1 cubic meter, one
12. Submersible oil pump: Q=1.5 cubic meters per hour, H=20M, two sets
13. Finished stainless steel chimney: inner diameter 800MM, height 15 meters, two
14. Energy saver: JN-8, two
15. Protective net cover: 500*500, 1 piece
16. Rain-proof louver air outlet: 500*500, 1 piece, 200*200, 1 piece
17. Ceiling exhaust fan: air volume 400 cubic meters per hour, wind pressure 100Pa, power 25W, one set
18. Axial flow fan: air volume 3373 cubic meters per hour, wind pressure 136Pa, power 257W, three sets
19. Explosion-proof axial flow fan: air volume 760 cubic meters per hour, wind pressure 54Pa, power 25W, one set
20. Flue gate valve: diameter 800mm, 2 pieces
21. A total of 46 butterfly valves
22. Automatic exhaust valve: 4
23. Balance valve: 2
24. Gate valve: 4
25. Pressure gauge: 40 pieces
26. Thermometer: 20
27. Axial flow fan: air volume 6000 cubic meters per hour, wind pressure 310Pa, power 1.5KW, two sets
28. Explosion-proof wave plate: GD400, 2 pieces
29. Various connecting pipes
30. Various connection lines
31. Boiler control cabinet
32. Submersible pump control cabinet
33. Cable tray AA1, AA2, AA3 distribution cabinet
34. A complete set of equipment such as gas metering
35. A complete set of equipment for climate compensators
36. Boiler automatic control DDC control process system
37. Other complete boiler system supporting equipment and materials
38. [Including but not limited to] all equipment transportation fees, insurance fees, installation and commissioning fees, technical supervision and inspection fees, value-added tax, risk fees.
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.