Media Center
HomeMedia CenterZBG Info

Two WNS5.6-1.0-Y Oil and Gas Dual-purpose Hot Water Boilers

2023-03-23 08:37:38

 1. Oil and gas dual-purpose hot water boiler body: WNS5.6-1.0-YQ=5.6MW P=18.5KW, two

2. Supporting burners: two

3. Heating hot water circulation pump: L=230 cubic meters per hour H=45M P=55KW, three sets (2 for use and 1 for standby)

4. Deaeration water pump: 8m3 per hour H=60M P=7.5KW two sets (1 for use and 1 for standby)

5. Fully automatic water softener: one

6. Analytical deaerator TH0-700: one set

7. Combined water tank for softening and deoxygenation: 2800*1800*1800, V=8 cubic meters

8. Heating circulation pump constant pressure water replenishment device: one tank with two pumps, constant pressure tank @ 800, water replenishment pump L=4 cubic meters per hour, H=30M P=2.2KW (two water replenishment pumps, one for use and one for backup) )

9. Oil storage tank: V=100 cubic meters, one

10. Comprehensive water treatment instrument: DN300 500W 220V, one set

Fuel gas dual-purpose hot water boiler

11. Daily oil tank: V= 1 cubic meter, one

12. Submersible oil pump: Q=1.5 cubic meters per hour, H=20M, two sets

13. Finished stainless steel chimney: inner diameter 800MM, height 15 meters, two

14. Energy saver: JN-8, two

15. Protective net cover: 500*500, 1 piece

16. Rain-proof louver air outlet: 500*500, 1 piece, 200*200, 1 piece

17. Ceiling exhaust fan: air volume 400 cubic meters per hour, wind pressure 100Pa, power 25W, one set

18. Axial flow fan: air volume 3373 cubic meters per hour, wind pressure 136Pa, power 257W, three sets

19. Explosion-proof axial flow fan: air volume 760 cubic meters per hour, wind pressure 54Pa, power 25W, one set

20. Flue gate valve: diameter 800mm, 2 pieces

21. A total of 46 butterfly valves

22. Automatic exhaust valve: 4

23. Balance valve: 2

24. Gate valve: 4

25. Pressure gauge: 40 pieces

26. Thermometer: 20

27. Axial flow fan: air volume 6000 cubic meters per hour, wind pressure 310Pa, power 1.5KW, two sets

28. Explosion-proof wave plate: GD400, 2 pieces

29. Various connecting pipes

30. Various connection lines

31. Boiler control cabinet

32. Submersible pump control cabinet

33. Cable tray AA1, AA2, AA3 distribution cabinet

34. A complete set of equipment such as gas metering

35. A complete set of equipment for climate compensators

36. Boiler automatic control DDC control process system

37. Other complete boiler system supporting equipment and materials

38. [Including but not limited to] all equipment transportation fees, insurance fees, installation and commissioning fees, technical supervision and inspection fees, value-added tax, risk fees.

Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other