According to the different production capacities of equipment manufacturers, the bidding equipment is divided into four packages: A, B, C, and D. They are as follows:
Package A: boiler and supporting equipment
serial number | Equipment name | unit | quantity | price | Manufacturing department or remarks |
1 | Circulating fluidized bed steam boiler | tower | 2 | ||
2 | Primary Fan | tower | 2 | ||
3 | Secondary fan | tower | 2 | ||
4 | Coal feeder | tower | 4 | ||
5 | Cold slag machine | tower | 2 | ||
6 | Auxiliary materials, instruments, pipelines and valves | set | 2 | ||
7 | Sample cooler | set | 4 | ||
8 | Spare parts and random information | set | 2 |
Package B: water treatment and pumping equipment
serial number | Equipment name | unit | quantity | price | Manufacturing department or remarks |
1 | Combined automatic sodium ion exchanger | Group | 1 | two tank exchanger | |
2 | soft water tank | Only | 2 | SMC assembly | |
3 | Atmospheric thermal deaerator | tower | 2 | ||
4 | Continuous blowdown expander | tower | 1 | ||
5 | Periodic sewage expansion container | tower | 1 | ||
6 | Electric feed water pump | tower | 3 | ||
7 | Deaeration pump | tower | 3 |
Package C: flue gas treatment equipment
serial number | Equipment name | unit | quantity | price | Manufacturing department or remarks |
1 | Pulse bag filter | set | 2 | ||
2 | Calcium injection desulfurization device in dilute phase furnace | set | 2 |
Package D: heat exchange device
serial number | Equipment name | unit | quantity | price | Manufacturing department or remarks |
1 | heat exchange unit | Group | 2 | ||
2 | water tank | tower | 1 | ||
3 | Water collection tank | tower | 1 | ||
4 | Sub-cylinder | tower | 1 |
1) Circulating fluidized bed steam boiler
Model: ZG20-1.6-ALL external circulating fluidized bed boiler
Rated steam evaporation: Q=20t/h
Rated outlet steam pressure: P=1.6MPa
Rated outlet steam temperature: 214°C
Rated feed water temperature: 104°C
Fuel: bituminous coal (the fuel characteristics will be provided by Party A after winning the bid, and the bid-winning manufacturer will design the boiler according to the fuel characteristics)
Design thermal efficiency: >87%
Furnace structure: membrane water wall
Hot air temperature (primary/secondary): 107/20°C
Exhaust gas temperature: <140°C
Matching economizer and air preheater
2) Primary fan
Air volume: Q=26003m3/h (standard condition)
Wind pressure: H=14177Pa (standard condition)
Power: N=160kW
Correct the wind pressure and air volume in the plateau area according to its own equipment,
The project location is 1140m above sea level,
The operating temperature refers to the local meteorological parameters in the tender.
3) Secondary fan
Air volume: Q=8294m3/h (standard condition)
Wind pressure: H=4453Pa (standard condition)
Power: N=37kW
Correct the wind pressure and air volume in the plateau area according to its own equipment,
The project location is 1140m above sea level,
The operating temperature refers to the local meteorological parameters in the tender.
4) Induced fan
Air volume: Q=72380m3/h (standard condition)
Wind pressure: H=4571Pa (standard condition)
Power: N=160kW
Correct the wind pressure and air volume in the plateau area according to its own equipment,
The project location is 1140m above sea level,
The operating temperature refers to the local meteorological parameters in the tender.
After the boiler desulfurization and dust removal equipment is determined, the wind pressure needs to be calculated.
5) Spiral coal feeder
GM-200 (one boiler is equipped with two sets, matching 20t/h boiler)
6) Drum type slag cooling machine
Conveying capacity: 2t/h (if the boiler has two slag outlets, configure 2 sets of 1t/h)
Reducer power: 3.0Kw
Material inlet temperature: <1000°C
Material outlet temperature: <80°C
Cooling water inlet temperature: 20~30℃
Cooling water outlet temperature: <80°C
Pressure loss: 0.08MPa
7) Auxiliary materials and accessories
The boiler factory is equipped with auxiliary materials and accessories such as cyclone separator, coal spreading fan, furnace wall cooling fan, feeding fan, wind cap, pipeline, valve and instrument that meet the operation requirements of the boiler body. (Centralized control is another consideration).
8) Sample cooler
XN0010.0
9) Spare parts and accompanying documents
Spare parts required for the boiler and its auxiliary equipment within a two-year period of operation.