On May 5, 2016,Columbia 30 ton biomass boiler project site came the latest news that the boiler is expected to conduct and complete hydrostatic test before the end of May. Then the installation work will enter into refractory & insulation installing, furnace drying and boiling etc stages. Meanwhile, ZBG's project engineer will guide the installation all the way to ensure the success of biomass corner tube boiler installation.
It is reported that ZBG engineers designed the 30 ton/hr biomass fired boiler strictly in accordance with ASME standards, and optimized its components according to the needs of customer (like burning palm kernel, palm fiber, etc.). Not only ZBG makes product meet environmental requirements, also bring customers a higher economic efficiency.
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.