In March 2016, an Indian client visited ZBG for further discussing about the coal fired boiler used in its 20MW coal power plant. His company holds a substantial capacity in fabric processing, owning 11 fabric processing units with a capacity to process one million meters fabric per day which comes to 365 million fabric per annum. The textile group is plan to establish a 20MW coal firing power plant, and the client quoted about 80 ton/hr coal fired boiler for the captive power plant.
The Indian client is talking with our sales manager and engineer
introducing our boiler production line and equipment
ZBG is a 70-year-history manufacturer and supplier in the field of boiler and pressure vessel designing, manufacturing, marketing, installation, and maintenance. We have 35 ton CFB boiler, 110 ton CFB boiler installed in India paper plant, thermal power plant.
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.