According to Engineer of WHRB project in Vietnam, today Q120/1000-50-3.82/450 50 ton/hr carbon rotary waste heat recovery boiler, manufactured by Zhengzhou Boiler Co., Ltd. is put into operation.
In July 2015, a Vietnam company ordered a carbon rotary waste heat recovery boiler from our company. Through months of designing, manufacturing, shipping and installation, the Q120/1000-50-3.82/450 is successfully put into operation on April 18, 2016.
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.