Media Center
HomeMedia CenterZBG Info

Inner Mongolia WNS4.2-1.0/95/70-YQ gas hot water boiler

2023-07-13 08:48:55
item number item name Specifications quantity unit   Arrival date (as defined by the International Chamber of Commerce Incoterms)
Earliest Arrival Date latest arrival date Bidder's arrival date [to be filled in by the bidder]
one, The main material of the process part            
1 Gas hot water boiler Power 4.2MW, equipment pressure 1.0 MPa, supply and return water temperature 95/70℃, including burner, NOx<30mg/m3 2 tower 30 days after signing the contract 45 days after signing the contract  
1-1 Flue gas condenser Supporting 4.2MW boiler 2 tower 30 days after signing the contract 45 days after signing the contract  
1-2 4.2MW boiler supporting sound insulation cover Supporting 4.2MW boiler 2 set 30 days after signing the contract 45 days after signing the contract  
2 primary circulation pump Q=400m3/h, H=28mH2O P=55kW, frequency conversion 2 tower 30 days after signing the contract 45 days after signing the contract  
3 primary water pump Q=4m3/h, H=32mH2O P=0.75kW, frequency conversion 2 tower 30 days after signing the contract 45 days after signing the contract  
4 Automatic water softener Softened water volume 20m3/h 1 set 30 days after signing the contract 45 days after signing the contract  
5 soft water tank V=15m3,3.0m×2.5m×2.0m 1 tower 30 days after signing the contract 45 days after signing the contract  
6 Vertical decontamination device DN300 PN10, straight type 2 tower 30 days after signing the contract 45 days after signing the contract  
7 Heat exchange unit Total heat exchange 7.75MW 1 set 30 days after signing the contract 45 days after signing the contract  
7-1 Plate heat exchanger The heat exchange capacity of a single unit is 5.43MW, the pressure of the equipment is 1.0MPa, and a single unit bears 70% of the heat load 2 tower 30 days after signing the contract 45 days after signing the contract  
7-2 Circulating water pump for heat exchange system Q=400m3/h, H=40mH2O P=75kW, frequency conversion 2 tower 30 days after signing the contract 45 days after signing the contract  
7-3 Make-up water pump for heat exchange system Q=16m3/h, H=46mH2O P=4kW, frequency conversion 2 tower 30 days after signing the contract 45 days after signing the contract  
two, Main materials of hot water system       30 days after signing the contract 45 days after signing the contract  
1 Y type decontamination device DN65  PN10 1 indivual 30 days after signing the contract 45 days after signing the contract  
2 butterfly valve DN300  PN16 D341H-16 11 indivual 30 days after signing the contract 45 days after signing the contract  
    DN100  PN16 D341H-16 6 indivual 30 days after signing the contract 45 days after signing the contract  
3 Flange check valve DN300  PN16 H44H-16C 2 indivual 30 days after signing the contract 45 days after signing the contract  
    DN250  PN16 H44H-16C 1 indivual 30 days after signing the contract 45 days after signing the contract  
    DN50  PN16 H44H-16C 2 indivual 30 days after signing the contract 45 days after signing the contract  
    DN40  PN16 H44H-16C 3 indivual 30 days after signing the contract 45 days after signing the contract  
4 Manual control valve DN150  PN16 H40H-16 3 indivual 30 days after signing the contract 45 days after signing the contract  
5 Flange globe valve DN150  PN16 J41H-16C 3 indivual 30 days after signing the contract 45 days after signing the contract  
    DN100  PN16 J41H-16C 1 indivual 30 days after signing the contract 45 days after signing the contract  
    DN65  PN16 J41H-16C 7 indivual 30 days after signing the contract 45 days after signing the contract  
    DN50  PN16 J41H-16C 5 indivual 30 days after signing the contract 45 days after signing the contract  
    DN40  PN16 J41H-16C 3 indivual 30 days after signing the contract 45 days after signing the contract  
    DN32  PN16 J41H-16C 2 indivual 30 days after signing the contract 45 days after signing the contract  
6 Flange metal soft joint DN300  PN10 4 indivual 30 days after signing the contract 45 days after signing the contract  
    DN50  PN10 4 indivual 30 days after signing the contract 45 days after signing the contract  
7 Spring micro-open safety valve DN32 A47H-16C 1 indivual 30 days after signing the contract 45 days after signing the contract  
8 head size DN300/DN250 6 indivual 30 days after signing the contract 45 days after signing the contract  
    DN50/DN40 4 indivual 30 days after signing the contract 45 days after signing the contract  
9 backflow preventer DN65 1 indivual 30 days after signing the contract 45 days after signing the contract  
10 cold water meter DN65 2 indivual 30 days after signing the contract 45 days after signing the contract  
    DN50 1 indivual 30 days after signing the contract 45 days after signing the contract  
11 Industrial Bimetallic Thermometer 0-100°C 6 indivual 30 days after signing the contract 45 days after signing the contract  
12 Spring Tube Pressure Gauge 0-1.0MPa 17 indivual 30 days after signing the contract 45 days after signing the contract  
13 seamless steel pipe ∅325×8 160 rice 30 days after signing the contract 45 days after signing the contract  
    ∅273×7 10 rice 30 days after signing the contract 45 days after signing the contract  
    ∅159×4.5 60 rice 30 days after signing the contract 45 days after signing the contract  
    ∅108×4 70 rice 30 days after signing the contract 45 days after signing the contract  
    ∅76×3.5 35 rice 30 days after signing the contract 45 days after signing the contract  
    ∅57×3.5 20 rice 30 days after signing the contract 45 days after signing the contract  
    ∅45×2.5 30 rice 30 days after signing the contract 45 days after signing the contract  
    ∅38×2.5 30 rice 30 days after signing the contract 45 days after signing the contract  
14 Steel for hangers   200 kg 30 days after signing the contract 45 days after signing the contract  
15 Aluminum silicate   8 m3 30 days after signing the contract 45 days after signing the contract  
16 0.5mm galvanized iron sheet   200 m2 30 days after signing the contract 45 days after signing the contract  
17 Exhaust valve DN20 PN16 12 indivual 30 days after signing the contract 45 days after signing the contract  
18 floor drain DN100 3 indivual 30 days after signing the contract 45 days after signing the contract  
19 Ductile Iron Pipe DN100 20 rice 30 days after signing the contract 45 days after signing the contract  
  Process piping installation supporting services            
1 Valve insulation 1. Insulation material: aluminum silicate
2. Insulation thickness: see design instructions for details
3. Valve specifications: see design drawings for details
1 m3 Complete within 10 days after arrival Completed within 30 days of arrival  
2 Flange insulation 1. Insulation material: aluminum silicate
2. Insulation thickness: see design instructions for details
3. Flange specifications: see design drawings for details
1 m3 Complete within 10 days after arrival Completed within 30 days of arrival  
3 Weld X-ray inspection 1. Name: X-ray flaw detection of weld seam
2. Film specification: 80mm*300mm
3. Tube wall thickness: within 16
100 open Complete within 10 days after arrival Completed within 30 days of arrival  
4 Pipeline corrosion protection 1. Rust removal level: St3 very thorough manual and power tool rust removal
2. Brushing (spraying) type: Hongdan epoxy anti-rust paint
3. Brushing (spraying) times, paint film thickness: two times
260 m Complete within 10 days after arrival Completed within 30 days of arrival  
5 Corrosion protection for general steel structures 1. Rust removal level: St3 very thorough manual and power tools
2. Brushing (spraying) variety: Hongdan epoxy anti-rust paint
3. Number of brushing (spraying) times, paint film thickness: see design instructions for details
180 kg Complete within 10 days after arrival Completed within 30 days of arrival  
three, The main material of the flue gas system            
1 Double-layer insulation stainless steel chimney DN600, height 20m 2 seat 30 days after signing the contract 45 days after signing the contract  
2 round flue Inner diameter ∅600 δ=5mm 4 m 30 days after signing the contract 45 days after signing the contract  
3 90 elbow DN600 R=650mm δ=5mm 2 indivual 30 days after signing the contract 45 days after signing the contract  
4 chimney muffler DN600 2 tower 30 days after signing the contract 45 days after signing the contract  
5 Accident exhaust fan in boiler room Low-noise DFBP35-11-5.6# explosion-proof axial flow fan, single air volume 5361m3/h 3 tower 30 days after signing the contract 45 days after signing the contract  
6 Inlet muffler for boiler room The size is 800×630, and the maximum air volume of a single unit is 7000m3/h 3 tower 30 days after signing the contract 45 days after signing the contract  
Four heating system            
1 Steel round two-column radiator GZY2-1.0/6-1.0 18 pieces 18 Group 30 days after signing the contract 45 days after signing the contract  
2 Galvanized steel DN40 100 rice 30 days after signing the contract 45 days after signing the contract  
    DN32 100 rice 30 days after signing the contract 45 days after signing the contract  
    DN20 80 rice 30 days after signing the contract 45 days after signing the contract  
3 ball valve Q11T-16 DN15 36 indivual 30 days after signing the contract 45 days after signing the contract  
4 Shut-off valve J11T-16 DN40 2 indivual 30 days after signing the contract 45 days after signing the contract  
5 Auto exhaust valve ZP-II DN32 6 indivual 30 days after signing the contract 45 days after signing the contract  
  Heating pipe installation supporting services            
1 Pipe oiling 1. Rust removal level: St2 Thorough manual and power tool rust removal
2. Paint type: anti-rust paint
3. Number of times of brushing, paint film thickness: see design instructions for details
280 m Complete within 10 days after arrival Completed within 30 days of arrival  
Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other