 The Company SBB ENERGY S.A. invites you to submit an offer for the designing, manufacture, delivery, transport, commissioning supervision during erection and start up for three gas fired watertube boilers (3x130 MWt) with the following parameters required by technical Specification:

No.

Specification

Unit

Value requirement by client

Warranty value by performer

Comments

1.

Nominal power of boiler – working by the greatest demand

MWt

130

 

………………………

 

1)  By water flow 3000 m3/h

2)  For temperature water (inlet, outlet):

tin = 65 ÷ 110 °C

tout = 90 ÷150 °C

3)  By pressure

p=1,15-1,45MPa

 

4) not less than 125MWt

2

Technical minimum of boiler

MWt

26

 

……………………

optimum value 5 -10 MW

3

Power of boiler by heating season

MWt

 

130

 

………………………

(gives performer regarding offer)

for

tin = 65 ÷ 100 °C

tout = 85 ÷ 140 °C

 

by pressure:

p = 1,15÷1,4 MPa

4

 

Power of boiler (work in reserve except heating season)

MWt

 

………………………

(gives performer regarding offer)

 

………………………

(gives performer regarding offer)

for

tin = 40 ÷ 55 °C

tout = 70 ÷ 80 °C

 

by pressure:

p = 0,8÷1,1 MPa

5

Boiler efficiency by nominal power

for natural gas

 

min. 95

 

 

………………………

(gives performer regarding offer)

By temperature of inlat water 95°C

6

Maximum water flow  

m3/h

3000

 

………………………

(gives performer regarding offer)

 

7

Minimum flue gases temperature

°C

 

…….

for natural gas

 

………..

for natural gas

(gives performer regarding offer)

 

 

  Emission requirements

IED Standards
= Requirements in Specification [mg/m3u]

SO2

NOx (without use SNCR)

dust

CO

Boiler of fuel – natural gas

35

100

5

100

Required time to achieve nominal parameters at startup from a cold state (stoppage > 8h) : ≤ 1h

Required time to achieve nominal parameters at startup from a warm state (stoppage < 8h) : ≤ 0,5h

Boiler availability: not less than 95% (in first year of exploitation)

Boiler availability: not less than 98% (in second and third year of exploitation)

Required burners with service in EU (prefer localization Poland or neighboring countries).

Boiler should be designed and carried out in accordance with European standards.

Boiler must have all needed documents and CE mark.

Complete project of boiler must be sanded to Purchaser before boiler prefabrication. Start of boiler prefabrication is possible after Purchaser approval of project.

Gas Fired Watertube Boilers.jpg

Gas Fired Watertube Boilers

Fuel parameters:

1) Natural gas minimum parameters

Parameter

Unit

Value

High heating value (HHV)

MJ/m3

≥ 34,1

Low heating value (LHV)

MJ/m3

≥ 31,0

Wobbe index

 

- nominal

MJ/m3

53,6

- the range of variation

MJ/m3

45,1-57,0

Hydrogen sulfide content

mg/m3

≤ 7,0

Oxygen content

% mol/mol

≤ 0,2

Carbon dioxide content

% mol/mol

≤ 3,0

Mercury vapor content

µg/m3

≤ 30,0

Dew point temperature for 8,4 MPa water from 1 April to 30 September

ºC

≤ +8,1

Dew point temperature for 8,4 MPa water from 1 October to 31 March

ºC

≤ -1,2

Hydrocarbons dew point temperature

ºC

0

Hydrocarbons content (which can condensate at -5 ºC and pressure which is in gas pipeline)

mg/m3

≤ 30,0

Dust content ( particle diametet higher than 5 µm)

mg/m3

≤ 1,0

Mercaptan sulfur content

mg/m3

≤ 16,0

Total sulfur content

mg/m3

≤ 40,0

Preliminary Supplier’s scope will be as follows:

1) Designing, manufacture, delivery, transport, commissioning supervision during erection and start up for three gas fired watertube boilers with total power ca. 390 MWt (3x130 MWt) with the parameters required by technical Specification,

2) Low emission, dual fuel burners (gas),

3) Air fans,

4) Air ducts designing,

5) Flue gas fans designing (if needed in technology) and provide a guidelines,

6) Sealing air and cooling air system,

7) Installation of boiler protection for stoppage period,

8) Execution of boiler control algorithms,

9) Delivery of all boiler sensors and drives,

10) Guidelines for circulating water pumps, gas system, compressed air system, DeNOx installation and after erection acid cleaning installation.

In Suppliers scope will be piping of boiler in range of 1 meter with suitable boiler valves and indication of terminal points in boiler.

Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other