Waste heat boiler design scope of supply:All main and auxiliary equipment, materials and designs within the range of waste heat boiler units (except for addit
We know that Jilin is located in the middle of Northeast China, and the provincial capital is Changchun. Do you know what is the most famous snack in Northea
320m2 sintering area of iron and steel plant with 12.8 tons sintering machine waste heat boiler project1. Meteorological conditions Average temperature
Boiler parameters1. Boiler type: condensing low nitrogen gas hot water boiler;2. Rated output heat load: 1400kW/set;3. The thermal efficiency of the boiler bod
5 Tons/hour Waste Heat Boiler Performance Parameters and Supply ListTechnical Parameters 5 tons/hour waste heat boiler tech
serial number device name Drawing number or model unit quantity Remark
170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List 1 Steam drum and internal device of steam drum
Coal mine production needs steam, wellhead heating and office dormitory area heating in winter need heating. The project user unit plans to purchase two 4-to
According to the different production capacities of equipment manufacturers, the bidding equipment is divided into four packages: A, B, C, and D. They are as
1 Design conditions The hottest month of the year (July) has an average temperature of 23.0°C The coldest month of the year (January) average tempera
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.